The following are some of the pictures of Tun Razak Exchange MRT station during construction.

📅 July 2017

Aerial view of the Tun Razak Exchange MRT station.

Aerial view of the Tun Razak Exchange MRT station (Jul 2017)
Aerial view of the Tun Razak Exchange MRT station (Jul 2017)

Pedestrian walkway leading to the entrance of the station.

Pedestrian walkway leading to the entrance of the station (Jul 2017)
Pedestrian walkway leading to the entrance of the station (Jul 2017)

Pedestrian walkway leading to the entrance of the station.

Pedestrian walkway leading to the entrance of the station (Jul 2017)
Pedestrian walkway leading to the entrance of the station (Jul 2017)

Pedestrian walkway leading to the entrance of the station.

Pedestrian walkway leading to the entrance of the station (Jul 2017)
Pedestrian walkway leading to the entrance of the station (Jul 2017)

Pedestrian walkway leading to the entrance of the station.

Pedestrian walkway leading to the entrance of the station (Jul 2017)
Pedestrian walkway leading to the entrance of the station (Jul 2017)

Entrance of the Tun Razak Exchange station.

Entrance of the Tun Razak Exchange station (Jul 2017)
Entrance of the Tun Razak Exchange station (Jul 2017)

Entrance of the Tun Razak Exchange station.

Entrance of the Tun Razak Exchange station (Jul 2017)
Entrance of the Tun Razak Exchange station (Jul 2017)

Concourse level of Tun Razak Exchange station.

Concourse level of Tun Razak Exchange station (Jul 2017)
Concourse level of Tun Razak Exchange station (Jul 2017)

Concourse level of Tun Razak Exchange station.

Concourse level of Tun Razak Exchange station (Jul 2017)
Concourse level of Tun Razak Exchange station (Jul 2017)

Concourse level of Tun Razak Exchange station.

Concourse level of Tun Razak Exchange station (Jul 2017)
Concourse level of Tun Razak Exchange station (Jul 2017)

Concourse level of Tun Razak Exchange station.

Concourse level of Tun Razak Exchange station (Jul 2017)
Concourse level of Tun Razak Exchange station (Jul 2017)

Concourse level of Tun Razak Exchange station.

Concourse level of Tun Razak Exchange station (Jul 2017)
Concourse level of Tun Razak Exchange station (Jul 2017)

Concourse level of Tun Razak Exchange station.

Concourse level of Tun Razak Exchange station (Jul 2017)
Concourse level of Tun Razak Exchange station (Jul 2017)

Escalators for inter-level access.

Escalators for inter-level access (Jul 2017)
Escalators for inter-level access (Jul 2017)

Ticket vending machines on concourse level.

Ticket vending machines on concourse level (Jul 2017)
Ticket vending machines on concourse level (Jul 2017)

Boarding platform at Tun Razak Exchange station.

Boarding platform at Tun Razak Exchange station (Jul 2017)
Boarding platform at Tun Razak Exchange station (Jul 2017)

Boarding platform at Tun Razak Exchange station.

Boarding platform at Tun Razak Exchange station (Jul 2017)
Boarding platform at Tun Razak Exchange station (Jul 2017)

Boarding platform at Tun Razak Exchange station.

Boarding platform at Tun Razak Exchange station (Jul 2017)
Boarding platform at Tun Razak Exchange station (Jul 2017)

Boarding platform at Tun Razak Exchange station.

Boarding platform at Tun Razak Exchange station (Jul 2017)
Boarding platform at Tun Razak Exchange station (Jul 2017)

📅 March 2017

The escalator structure that has been fitted out and is currently undergoing testing at the platform level of the Tun Razak Exchange Station.

The escalator structure that has been fitted out and is currently undergoing testing at the platform level of the Tun Razak Exchange Station. (Mar 2017)
The escalator structure that has been fitted out and is currently undergoing testing at the platform level of the Tun Razak Exchange Station. (Mar 2017)

The Islamic corporate element, the theme for the interior design of the Tun Razak Exchange Station is visible on its ceilings.

The Islamic corporate element, the theme for the interior design of the Tun Razak Exchange Station is visible on its ceilings. (Mar 2017)
The Islamic corporate element, the theme for the interior design of the Tun Razak Exchange Station is visible on its ceilings. (Mar 2017)

📅 January 2017

Platform screen doors that have been installed inside the Tun Razak Exchange Station.

Platform screen doors that have been installed inside the Tun Razak Exchange Station. (Jan 2017)
Platform screen doors that have been installed inside the Tun Razak Exchange Station. (Jan 2017)

The Islamic corporate element, the theme for the interior design of the Tun Razak Exchange Station is visible.

The Islamic corporate element, the theme for the interior design of the Tun Razak Exchange Station is visible. (Jan 2017)
The Islamic corporate element, the theme for the interior design of the Tun Razak Exchange Station is visible. (Jan 2017)

📅 November 2016

Various ongoing works inside the concourse level with a view of the Islamic corporate element, the theme for Tun Razak Exchange Station.

Various ongoing works inside the concourse level with a view of the Islamic corporate element, the theme for Tun Razak Exchange Station. (Nov 2016)
Various ongoing works inside the concourse level with a view of the Islamic corporate element, the theme for Tun Razak Exchange Station. (Nov 2016)

📅 September 2016

The Tun Razak Exchange Station entrance structure taking shape, with the link road into the Tun Razak Exchange development being built over the station box.

The Tun Razak Exchange Station entrance structure taking shape, with the link road into the Tun Razak Exchange development being built over the station box. (Sep 2016)
The Tun Razak Exchange Station entrance structure taking shape, with the link road into the Tun Razak Exchange development being built over the station box. (Sep 2016)

View of the roof truss for the Tun Razak Exchange Station being installed.

View of the roof truss for the Tun Razak Exchange Station being installed. (Sep 2016)
View of the roof truss for the Tun Razak Exchange Station being installed. (Sep 2016)

View of the concourse level of Tun Razak Exchange Station.

View of the concourse level of Tun Razak Exchange Station. (Sep 2016)
View of the concourse level of Tun Razak Exchange Station. (Sep 2016)

View of the completed track works inside the Tun Razak Exchange Station.

View of the completed track works inside the Tun Razak Exchange Station. (Sep 2016)
View of the completed track works inside the Tun Razak Exchange Station. (Sep 2016)

📅 July 2016

The Tun Razak Exchange Station structure taking shape.

The Tun Razak Exchange Station structure taking shape. (Jul 2016)
The Tun Razak Exchange Station structure taking shape. (Jul 2016)

📅 Artist impression

Artist impression of Tun Razak Exchange station.

Artist impression of Tun Razak Exchange station
Artist impression of Tun Razak Exchange station
Artist impression of Tun Razak Exchange station
Artist impression of Tun Razak Exchange station
Artist impression of Tun Razak Exchange station
Artist impression of Tun Razak Exchange station
Artist impression of Tun Razak Exchange station
Artist impression of Tun Razak Exchange station

MRT stations of MRT Kajang Line

The MRT Kajang Line is the first line of the Klang Valley Mass Rapid Transit Project (KVMRT). The line runs underground for a distance of 9.5km beneath the centre of Kuala Lumpur while the rest of the alignment is elevated. The line has 31 stations of which seven are underground.

MRT Kajang Line Alignment Map
MRT Kajang Line Alignment Map, view larger version

The following is a simplified table showing the integrations and connections of MRT Kajang Line with other rail systems to complete the Greater Kuala Lumpur / Klang Valley Integrated Transit System.

Stations for MRT Kajang Line
SBK01Sungai Buloh ⇄ KA08
SBK02Kampung Selamat
SBK04Kwasa Damansara
SBK05Kwasa Sentral
SBK06Kota Damansara
SBK07Surian
SBK08Mutiara Damansara
SBK09Bandar Utama
SBK10Taman Tun Dr Ismail
SBK12Phileo Damansara
SBK13Pusat Bandar Damansara
SBK14Semantan
SBK15Muzium Negara ⇄ KJ15 MR1 KA01 ERL
SBK16Pasar Seni ⇄ KJ14 KA02
SBK17Merdeka ⇄ AG8 SP8 MR4
SBK18ABukit Bintang ⇄ MR6
SBK20Tun Razak Exchange
SBK21Cochrane
SBK22Maluri ⇄ AG13
SBK23Taman Pertama
SBK24Taman Midah
SBK25Taman Mutiara
SBK26Taman Connaught
SBK27Taman Suntex
SBK28Sri Raya
SBK29Bandar Tun Hussein Onn
SBK30Batu 11 Cheras
SBK31Bukit Dukung
SBK33Sungai Jernih
SBK34Stadium Kajang
SBK34Kajang ⇄ KB06
Site Search

Did you find what you are looking for? Try out the enhanced Google Search:

(Visited 203 times, 2 visits today)

Categorized in: