The following are some of the pictures of Taman Midah MRT station during construction.

📅 April 2017

View of the completed Taman Midah Station.

View of the completed Taman Midah Station. (Apr 2017)
View of the completed Taman Midah Station. (Apr 2017)

The multi-storey park and ride building that has been built at the Taman Midah Station.

The multi-storey park and ride building that has been built at the Taman Midah Station. (Apr 2017)
The multi-storey park and ride building that has been built at the Taman Midah Station. (Apr 2017)

The connection between the Taman Midah Station to the multi-storey park and ride building.

The connection between the Taman Midah Station to the multi-storey park and ride building. (Apr 2017)
The connection between the Taman Midah Station to the multi-storey park and ride building. (Apr 2017)

The pedestrian bridge connecting passengers from the Taman Midah Station to the multi-storey park and ride building.

The pedestrian bridge connecting passengers from the Taman Midah Station to the multi-storey park and ride building. (Apr 2017)
The pedestrian bridge connecting passengers from the Taman Midah Station to the multi-storey park and ride building. (Apr 2017)

📅 March 2017

The passenger lay-by area that has been completed at the Taman Midah Station.

The passenger lay-by area that has been completed at the Taman Midah Station. (Mar 2017)
The passenger lay-by area that has been completed at the Taman Midah Station. (Mar 2017)

Landscaping and turfing done at the Taman Midah Station.

Landscaping and turfing done at the Taman Midah Station. (Mar 2017)
Landscaping and turfing done at the Taman Midah Station. (Mar 2017)

The automated fare collection gates that have been installed inside the Taman Midah Station.

The automated fare collection gates that have been installed inside the Taman Midah Station. (Mar 2017)
The automated fare collection gates that have been installed inside the Taman Midah Station. (Mar 2017)

The pedestrian linkway connecting the park and ride parking facility to the Taman Midah Station.

The pedestrian linkway connecting the park and ride parking facility to the Taman Midah Station. (Mar 2017)
The pedestrian linkway connecting the park and ride parking facility to the Taman Midah Station. (Mar 2017)

📅 February 2017

Aerial view of the Taman Midah Station.

Aerial view of the Taman Midah Station. (Feb 2017)
Aerial view of the Taman Midah Station. (Feb 2017)

📅 January 2017

The multi-storey park and ride parking facility undergoing construction at the Taman Midah Station.

The multi-storey park and ride parking facility undergoing construction at the Taman Midah Station. (Jan 2017)
The multi-storey park and ride parking facility undergoing construction at the Taman Midah Station. (Jan 2017)

The pedestrian bridge connecting the Taman Midah Station and multi-storey park and ride parking facility that is currently being built.

The pedestrian bridge connecting the Taman Midah Station and multi-storey park and ride parking facility that is currently being built. (Jan 2017)
The pedestrian bridge connecting the Taman Midah Station and multi-storey park and ride parking facility that is currently being built. (Jan 2017)

MRT stations of MRT Kajang Line

The MRT Kajang Line is the first line of the Klang Valley Mass Rapid Transit Project (KVMRT). The line runs underground for a distance of 9.5km beneath the centre of Kuala Lumpur while the rest of the alignment is elevated. The line has 31 stations of which seven are underground.

MRT Kajang Line Alignment Map
MRT Kajang Line Alignment Map, view larger version

The following is a simplified table showing the integrations and connections of MRT Kajang Line with other rail systems to complete the Greater Kuala Lumpur / Klang Valley Integrated Transit System.

Stations for MRT Kajang Line
SBK01Sungai Buloh ⇄ KA08
SBK02Kampung Selamat
SBK04Kwasa Damansara
SBK05Kwasa Sentral
SBK06Kota Damansara
SBK07Surian
SBK08Mutiara Damansara
SBK09Bandar Utama
SBK10Taman Tun Dr Ismail
SBK12Phileo Damansara
SBK13Pusat Bandar Damansara
SBK14Semantan
SBK15Muzium Negara ⇄ KJ15 MR1 KA01 ERL
SBK16Pasar Seni ⇄ KJ14 KA02
SBK17Merdeka ⇄ AG8 SP8 MR4
SBK18ABukit Bintang ⇄ MR6
SBK20Tun Razak Exchange
SBK21Cochrane
SBK22Maluri ⇄ AG13
SBK23Taman Pertama
SBK24Taman Midah
SBK25Taman Mutiara
SBK26Taman Connaught
SBK27Taman Suntex
SBK28Sri Raya
SBK29Bandar Tun Hussein Onn
SBK30Batu 11 Cheras
SBK31Bukit Dukung
SBK33Sungai Jernih
SBK34Stadium Kajang
SBK34Kajang ⇄ KB06
Site Search

Did you find what you are looking for? Try out the enhanced Google Search:

(Visited 168 times, 1 visits today)

Categorized in: