The following are some of the pictures of Sungai Buloh MRT station during construction.

📅 December 2016

The passenger layby at the Sungai Buloh Station.

The passenger layby at the Sungai Buloh Station.
The passenger layby at the Sungai Buloh Station.

The escalators and stairs at the concourse level of the Sungai Buloh Station.

The escalators and stairs at the concourse level of the Sungai Buloh Station.
The escalators and stairs at the concourse level of the Sungai Buloh Station.

📅 November 2016

View of the completed Sungai Buloh MRT Station with the common concourse with the Sungai Buloh KTM Station over the KTM tracks. Also seen is an MRT train undergoing testing.

View of the completed Sungai Buloh MRT Station with the common concourse with the Sungai Buloh KTM Station over the KTM tracks. Also seen is an MRT train undergoing testing.
View of the completed Sungai Buloh MRT Station with the common concourse with the Sungai Buloh KTM Station over the KTM tracks. Also seen is an MRT train undergoing testing.

📅 September 2016

View of the Sungai Buloh MRT Station (white roof) with the common concourse with the Sungai Buloh KTM Station (red roof)

View of the Sungai Buloh MRT Station (white roof) with the common concourse with the Sungai Buloh KTM Station (red roof)
View of the Sungai Buloh MRT Station (white roof) with the common concourse with the Sungai Buloh KTM Station (red roof)

View of the platform level of the Sungai Buloh MRT Station.

View of the platform level of the Sungai Buloh MRT Station.
View of the platform level of the Sungai Buloh MRT Station.

📅 June 2016

View of the completed common concourse linking both the Sungai Buloh MRT Station with the KTM Komuter Station.

View of the completed common concourse linking both the Sungai Buloh MRT Station with the KTM Komuter Station
View of the completed common concourse linking both the Sungai Buloh MRT Station with the KTM Komuter Station

Aerial view of the pedestrian entrance bridge that leads towards the entrance of the Sungai Buloh Station.

Aerial view of the pedestrian entrance bridge that leads towards the entrance of the Sungai Buloh Station
Aerial view of the pedestrian entrance bridge that leads towards the entrance of the Sungai Buloh Station

📅 May 2016

The MRT Sungai Buloh Station which is located next to the KTM train tracks.

The MRT Sungai Buloh Station which is located next to the KTM train tracks
The MRT Sungai Buloh Station which is located next to the KTM train tracks

The MRT Sungai Buloh Station (left) next to the KTM Sungai Buloh Station (right).

The MRT Sungai Buloh Station (left) next to the KTM Sungai Buloh Station (right)
The MRT Sungai Buloh Station (left) next to the KTM Sungai Buloh Station (right)

📅 April 2016

View of the train undergoing testing at the Sungai Buloh Station.

View of the train undergoing testing at the Sungai Buloh Station
View of the train undergoing testing at the Sungai Buloh Station

View of the Sungai Buloh MRT Station (left) located next to the KTM train tracks (right).

View of the Sungai Buloh MRT Station (left) located next to the KTM train tracks (right).
View of the Sungai Buloh MRT Station (left) located next to the KTM train tracks (right).

Aerial view of the pedestrian bridge connecting the Sungai Buloh KTM and MRT stations.

Aerial view of the pedestrian bridge connecting the Sungai Buloh KTM and MRT stations
Aerial view of the pedestrian bridge connecting the Sungai Buloh KTM and MRT stations

The escalators leading up to the MRT station from the KTM for commuters.

The escalators leading up to the MRT station from the KTM for commuters.
The escalators leading up to the MRT station from the KTM for commuters.

📅 March 2016

Construction at the concourse level of the Sungai Buloh Station in progress.

Construction at the concourse level of the Sungai Buloh Station in progress
Construction at the concourse level of the Sungai Buloh Station in progress

Ongoing works of the link between the Sungai Buloh KTM Komuter (left) and MRT Station (right).

Ongoing works of the link between the Sungai Buloh KTM Komuter (left) and MRT Station (right).
Ongoing works of the link between the Sungai Buloh KTM Komuter (left) and MRT Station (right).

📅 February 2016

Escalator being installed inside the Sungai Buloh Station.

Escalator being installed inside the Sungai Buloh Station
Escalator being installed inside the Sungai Buloh Station

Construction at the concourse level of the Sungai Buloh Station in progress.

Construction at the concourse level of the Sungai Buloh Station in progress.
Construction at the concourse level of the Sungai Buloh Station in progress.

📅 January 2016

The view from the Sungai Buloh KTM Station of the common concourse level being constructed.

The view from the Sungai Buloh KTM Station of the common concourse level being constructed.
The view from the Sungai Buloh KTM Station of the common concourse level being constructed.

View of the completed MRT guideway crossing over Jalan Kuala Selangor.

View of the completed MRT guideway crossing over Jalan Kuala Selangor.
View of the completed MRT guideway crossing over Jalan Kuala Selangor.

The common concourse of the Sungai Buloh KTM Station (red roof) and the Sungai Buloh MRT Station (left) taking shape.

The common concourse of the Sungai Buloh KTM Station (red roof) and the Sungai Buloh MRT Station (left) taking shape.
The common concourse of the Sungai Buloh KTM Station (red roof) and the Sungai Buloh MRT Station (left) taking shape.

View of the Sungai Buloh Station and the common concourse level of the station.

View of the Sungai Buloh Station and the common concourse level of the station.
View of the Sungai Buloh Station and the common concourse level of the station.

MRT stations of MRT Kajang Line

The MRT Kajang Line is the first line of the Klang Valley Mass Rapid Transit Project (KVMRT). The line runs underground for a distance of 9.5km beneath the centre of Kuala Lumpur while the rest of the alignment is elevated. The line has 31 stations of which seven are underground.

MRT Kajang line Alignment Map
MRT Kajang line Alignment Map, view larger version

The following is a simplified table showing the integrations and connections of MRT Kajang line with other rail systems to complete the Greater Kuala Lumpur / Klang Valley Integrated Transit System.

Stations for MRT Kajang Line
SBK01Sungai Buloh ⇄ KA08
SBK02Kampung Selamat
SBK04Kwasa Damansara
SBK05Kwasa Sentral
SBK06Kota Damansara
SBK07Surian
SBK08Mutiara Damansara
SBK09Bandar Utama
SBK10Taman Tun Dr Ismail
SBK12Phileo Damansara
SBK13Pusat Bandar Damansara
SBK14Semantan
SBK15Muzium Negara ⇄ KJ15 MR1 KA01 ERL
SBK16Pasar Seni ⇄ KJ14 KA02
SBK17Merdeka ⇄ AG8 SP8 MR4
SBK18ABukit Bintang ⇄ MR6
SBK20Tun Razak Exchange
SBK21Cochrane
SBK22Maluri ⇄ AG13
SBK23Taman Pertama
SBK24Taman Midah
SBK25Taman Mutiara
SBK26Taman Connaught
SBK27Taman Suntex
SBK28Sri Raya
SBK29Bandar Tun Hussein Onn
SBK30Batu 11 Cheras
SBK31Bukit Dukung
SBK33Sungai Jernih
SBK34Stadium Kajang
SBK34Kajang ⇄ KB06
Site Search

Did you find what you are looking for? Try out the enhanced Google Search:

(Visited 493 times, 4 visits today)

Categorized in: