The following are some of the pictures of Phileo Damansara MRT station during construction.

📅 December 2016

Construction of exit ramp from the Phileo Damansara Station multi-storey park and ride parking facility.

Construction of exit ramp from the Phileo Damansara Station multi-storey park and ride parking facility. (Dec 2016)
Construction of exit ramp from the Phileo Damansara Station multi-storey park and ride parking facility. (Dec 2016)

Aerial view of the pedestrian link bridge at the Phileo Damansara Station over the Sprint Highway.

Aerial view of the pedestrian link bridge at the Phileo Damansara Station over the Sprint Highway. (Dec 2016)
Aerial view of the pedestrian link bridge at the Phileo Damansara Station over the Sprint Highway. (Dec 2016)

📅 October 2016

View of the Phileo Damansara MRT Station undergoing construction works.

View of the Phileo Damansara MRT Station undergoing construction works. (Oct 2016)
View of the Phileo Damansara MRT Station undergoing construction works. (Oct 2016)

The pedestrian link bridge heading out of the Phileo Damansara Station.

The pedestrian link bridge heading out of the Phileo Damansara Station. (Oct 2016)
The pedestrian link bridge heading out of the Phileo Damansara Station. (Oct 2016)

View of the concourse level with escalators already installed inside the station.

View of the concourse level with escalators already installed inside the station. (Oct 2016)
View of the concourse level with escalators already installed inside the station. (Oct 2016)

View of the platform level of the Phileo Damansara Station.

View of the platform level of the Phileo Damansara Station. (Oct 2016)
View of the platform level of the Phileo Damansara Station. (Oct 2016)

📅 January 2016

Construction at the Phileo Damansara Station in progress.

Construction at the Phileo Damansara Station in progress. (Jan 2016)
Construction at the Phileo Damansara Station in progress. (Jan 2016)

Architectural works for the Phileo Damansara Station being done.

Architectural works for the Phileo Damansara Station being done. (Jan 2016)
Architectural works for the Phileo Damansara Station being done. (Jan 2016)

Ongoing construction of Entrance A of the Phileo Damansara Station with pedestrian bridge over the SPRINT Highway.

Ongoing construction of Entrance A of the Phileo Damansara Station with pedestrian bridge over the SPRINT Highway. (Jan 2016)
Ongoing construction of Entrance A of the Phileo Damansara Station with pedestrian bridge over the SPRINT Highway. (Jan 2016)

Escalators at the Entrance A of the Station Phileo Damansara being installed.

Escalators at the Entrance A of the Station Phileo Damansara being installed. (Jan 2016)
Escalators at the Entrance A of the Station Phileo Damansara being installed. (Jan 2016)

📅 September 2015

Track works on the completed guideway along SPRINT Highway.

Track works on the completed guideway along SPRINT Highway. (Sep 2015)
Track works on the completed guideway along SPRINT Highway. (Sep 2015)

Ongoing track works near the Phileo Damansara Station.

Ongoing track works near the Phileo Damansara Station. (Sep 2015)
Ongoing track works near the Phileo Damansara Station. (Sep 2015)

View of the site for the Phileo Damansara Station multi-storey park and ride building.

View of the site for the Phileo Damansara Station multi-storey park and ride building. (Sep 2015)
View of the site for the Phileo Damansara Station multi-storey park and ride building. (Sep 2015)

View of the Phileo Damansara Station with the pedestrian bridge structure over the SPRINT Highway installed.

View of the Phileo Damansara Station with the pedestrian bridge structure over the SPRINT Highway installed. (Sep 2015)
View of the Phileo Damansara Station with the pedestrian bridge structure over the SPRINT Highway installed. (Sep 2015)

MRT stations of MRT Kajang Line

The MRT Kajang Line is the first line of the Klang Valley Mass Rapid Transit Project (KVMRT). The line runs underground for a distance of 9.5km beneath the centre of Kuala Lumpur while the rest of the alignment is elevated. The line has 31 stations of which seven are underground.

MRT Kajang Line Alignment Map
MRT Kajang Line Alignment Map, view larger version

The following is a simplified table showing the integrations and connections of MRT Kajang Line with other rail systems to complete the Greater Kuala Lumpur / Klang Valley Integrated Transit System.

Stations for MRT Kajang Line
SBK01Sungai Buloh ⇄ KA08
SBK02Kampung Selamat
SBK04Kwasa Damansara
SBK05Kwasa Sentral
SBK06Kota Damansara
SBK07Surian
SBK08Mutiara Damansara
SBK09Bandar Utama
SBK10Taman Tun Dr Ismail
SBK12Phileo Damansara
SBK13Pusat Bandar Damansara
SBK14Semantan
SBK15Muzium Negara ⇄ KJ15 MR1 KA01 ERL
SBK16Pasar Seni ⇄ KJ14 KA02
SBK17Merdeka ⇄ AG8 SP8 MR4
SBK18ABukit Bintang ⇄ MR6
SBK20Tun Razak Exchange
SBK21Cochrane
SBK22Maluri ⇄ AG13
SBK23Taman Pertama
SBK24Taman Midah
SBK25Taman Mutiara
SBK26Taman Connaught
SBK27Taman Suntex
SBK28Sri Raya
SBK29Bandar Tun Hussein Onn
SBK30Batu 11 Cheras
SBK31Bukit Dukung
SBK33Sungai Jernih
SBK34Stadium Kajang
SBK34Kajang ⇄ KB06
Site Search

Did you find what you are looking for? Try out the enhanced Google Search:

(Visited 244 times, 1 visits today)

Categorized in: