The following are some of the pictures of Maluri MRT station during construction.

๐Ÿ“… July 2017

Arial view of Maluri MRT station and its suroundings.

Arial view of Maluri MRT station and its suroundings (Jul 2017)
Arial view of Maluri MRT station and its suroundings (Jul 2017)

Boarding Platform 1: Sungai Buloh โ€“ Kajang Line towards Kajang.

Boarding Platform 1: Sungai Buloh - Kajang Line towards Kajang (Jul 2017)
Boarding Platform 1: Sungai Buloh โ€“ Kajang Line towards Kajang (Jul 2017)

Boarding Platforms at Maluri MRT station.

Boarding Platforms at Maluri MRT station (Jul 2017)
Boarding Platforms at Maluri MRT station (Jul 2017)

Boarding Platform 2: Sungai Buloh โ€“ Kajang Line towards Sungai Buloh.

Boarding Platform 2: Sungai Buloh - Kajang Line towards Sungai Buloh (Jul 2017)
Boarding Platform 2: Sungai Buloh โ€“ Kajang Line towards Sungai Buloh (Jul 2017)

Concourse level of Maluri station.

Concourse level of Maluri station (Jul 2017)
Concourse level of Maluri station (Jul 2017)

Lighter, more playful decorative walls on concourse level of Maluri MRT station.

Lighter, more playful decorative walls on concourse level of Maluri MRT station (Jul 2017)
Lighter, more playful decorative walls on concourse level of Maluri MRT station (Jul 2017)

Concourse level of Maluri station.

Concourse level of Maluri station (Jul 2017)
Concourse level of Maluri station (Jul 2017)

Access gates and customer service office located on concourse level of Maluri station.

Access gates and customer service office located on concourse level of Maluri station (Jul 2017)
Access gates and customer service office located on concourse level of Maluri station (Jul 2017)

Lighter, more playful decorative walls on concourse level of Maluri station.

Lighter, more playful decorative walls on concourse level of Maluri station (Jul 2017)
Lighter, more playful decorative walls on concourse level of Maluri station (Jul 2017)

Escalators and stair for access to the ground level, heading towards Entrance A.

Escalators and stair for access to the ground level, heading towards Entrance A (Jul 2017)
Escalators and stair for access to the ground level, heading towards Entrance A (Jul 2017)

Concourse level of Maluri station.

Concourse level of Maluri station (Jul 2017)
Concourse level of Maluri station (Jul 2017)

Escalators and stair for access to the ground level.

Escalators and stair for access to the ground level (Jul 2017)
Escalators and stair for access to the ground level (Jul 2017)

Two entrances to the Maluri MRT station on both side of Jalan Cheras.

Two entrances to the Maluri MRT station on both side of Jalan Cheras (Jul 2017)
Two entrances to the Maluri MRT station on both side of Jalan Cheras (Jul 2017)

๐Ÿ“… April 2017

The Maluri Station entrance taking shape.

The Maluri Station entrance taking shape. (Apr 2017)
The Maluri Station entrance taking shape. (Apr 2017)

Toilet facilities inside the Maluri Station that is already ready.

Toilet facilities inside the Maluri Station that is already ready. (Apr 2017)
Toilet facilities inside the Maluri Station that is already ready. (Apr 2017)

Concourse level of the Maluri Station with integration of the โ€˜New Generationโ€™ theme made visible on the walls.

Concourse level of the Maluri Station with integration of the 'New Generation' theme made visible on the walls. (Apr 2017)
Concourse level of the Maluri Station with integration of the โ€˜New Generationโ€™ theme made visible on the walls. (Apr 2017)

Automated fare collection gates structure that has been installed inside the Maluri Station.

Automated fare collection gates structure that has been installed inside the Maluri Station. (Apr 2017)
Automated fare collection gates structure that has been installed inside the Maluri Station. (Apr 2017)

๐Ÿ“… February 2017

Platform screen doors that have been installed inside the Maluri Station.

Platform screen doors that have been installed inside the Maluri Station. (Feb 2017)
Platform screen doors that have been installed inside the Maluri Station. (Feb 2017)

View of the track cross-over, the only one for the underground section at the Maluri Station.

View of the track cross-over, the only one for the underground section at the Maluri Station. (Feb 2017)
View of the track cross-over, the only one for the underground section at the Maluri Station. (Feb 2017)

๐Ÿ“… December 2016

The completed crossover in the underground section at the Maluri Station.

The completed crossover in the underground section at the Maluri Station. (Dec 2016)
The completed crossover in the underground section at the Maluri Station. (Dec 2016)

The stairs and escalators that have been installed inside the Maluri Station.

The stairs and escalators that have been installed inside the Maluri Station. (Dec 2016)
The stairs and escalators that have been installed inside the Maluri Station. (Dec 2016)

๐Ÿ“… February 2016

View of the Adits B and C area of the station box of the Maluri Station.

View of the Adits B and C area of the station box of the Maluri Station. (Feb 2016)
View of the Adits B and C area of the station box of the Maluri Station. (Feb 2016)

View of the track crossover inside the Maluri Station.

View of the track crossover inside the Maluri Station. (Feb 2016)
View of the track crossover inside the Maluri Station. (Feb 2016)

๐Ÿ“… December 2015

View of the Adits B and C area of the station box.

View of the Adits B and C area of the station box. (Dec 2015)
View of the Adits B and C area of the station box. (Dec 2015)

๐Ÿ“… October 2015

View of the Adits B and C area of the station box.

View of the Adits B and C area of the station box. (Oct 2015)
View of the Adits B and C area of the station box. (Oct 2015)

๐Ÿ“… September 2015

Construction of the staircase from the platform level to the concourse level in progress.

Construction of the staircase from the platform level to the concourse level in progress. Sep 2015
Construction of the staircase from the platform level to the concourse level in progress. Sep 2015

Excavation in progress for Entrance A.

Excavation in progress for Entrance A. Sep 2015
Excavation in progress for Entrance A. Sep 2015

๐Ÿ“… May 2015

View of the station site, where the Roof Slab for the Adits B and C area is being constructed.

View of the station site, where the Roof Slab for the Adits B and C area is being constructed. May 2015
View of the station site, where the Roof Slab for the Adits B and C area is being constructed. May 2015

Roof Slab construction in progress.

Roof Slab construction in progress. May 2015
Roof Slab construction in progress. May 2015

Location of Entrance A where excavation work is in progress.

Location of Entrance A where excavation work is in progress. May 2015
Location of Entrance A where excavation work is in progress. May 2015

View of the metro decking (white slabs) over the station box used as a temporary road.

View of the metro decking (white slabs) over the station box used as a temporary road. May 2015
View of the metro decking (white slabs) over the station box used as a temporary road. May 2015

๐Ÿ“… Artist impression

Artist impression of Maluri station.

Artist impression of Maluri station
Artist impression of Maluri station
Artist impression of Maluri station
Artist impression of Maluri station
Artist impression of Maluri station
Artist impression of Maluri station

MRT stations of MRT Kajang Line

The MRT Kajang Line is the first line of the Klang Valley Mass Rapid Transit Project (KVMRT). The line runs underground for a distance of 9.5km beneath the centre of Kuala Lumpur while the rest of the alignment is elevated. The line has 31 stations of which seven are underground.

MRT Kajang Line Alignment Map
MRT Kajang Line Alignment Map, view larger version

The following is a simplified table showing the integrations and connections of MRT Kajang Line with other rail systems to complete the Greater Kuala Lumpur / Klang Valley Integrated Transit System.

Stations for MRT Kajang Line
SBK01Sungai Bulohย โ‡„ย KA08
SBK02Kampung Selamat
SBK04Kwasa Damansara
SBK05Kwasa Sentral
SBK06Kota Damansara
SBK07Surian
SBK08Mutiara Damansara
SBK09Bandar Utama
SBK10Taman Tun Dr Ismail
SBK12Phileo Damansara
SBK13Pusat Bandar Damansara
SBK14Semantan
SBK15Muzium Negaraย โ‡„ย KJ15ย MR1ย KA01ย ERL
SBK16Pasar Seniย โ‡„ย KJ14ย KA02
SBK17Merdekaย โ‡„ย AG8ย SP8ย MR4
SBK18ABukit Bintangย โ‡„ย MR6
SBK20Tun Razak Exchange
SBK21Cochrane
SBK22Maluriย โ‡„ย AG13
SBK23Taman Pertama
SBK24Taman Midah
SBK25Taman Mutiara
SBK26Taman Connaught
SBK27Taman Suntex
SBK28Sri Raya
SBK29Bandar Tun Hussein Onn
SBK30Batu 11 Cheras
SBK31Bukit Dukung
SBK33Sungai Jernih
SBK34Stadium Kajang
SBK34Kajangย โ‡„ย KB06
Site Search

Did you find what you are looking for? Try out the enhanced Google Search:

(Visited 347 times, 3 visits today)

Categorized in: