The following are some of the pictures of Kota Damansara MRT station during construction.

📅 January 2017

An MRT train departs from the Kota Damansara MRT Station heading south.

An MRT train departs from the Kota Damansara MRT Station heading south.
An MRT train departs from the Kota Damansara MRT Station heading south.

📅 November 2016

The guideway heading out of the Kota Damansara Station with sound barriers installed.

The guideway heading out of the Kota Damansara Station with sound barriers installed.
The guideway heading out of the Kota Damansara Station with sound barriers installed.

📅 September 2016

View of the Kota Damansara Station.

View of the Kota Damansara Station.
View of the Kota Damansara Station.

📅 June 2016

Ongoing construction of the entrance of the Kota Damansara Station.

Ongoing construction of the entrance of the Kota Damansara Station.
Ongoing construction of the entrance of the Kota Damansara Station.

Tactile tiles being fitted at the Kota Damansara Station.

Tactile tiles being fitted at the Kota Damansara Station.
Tactile tiles being fitted at the Kota Damansara Station.

Final touches on the ticketing booth being done at the Kota Damanasara Station.

Final touches on the ticketing booth being done at the Kota Damanasara Station.
Final touches on the ticketing booth being done at the Kota Damanasara Station.

The escalators and stairs leading up to the platform level of the Kota Damansara Station almost ready.

The escalators and stairs leading up to the platform level of the Kota Damansara Station almost ready.
The escalators and stairs leading up to the platform level of the Kota Damansara Station almost ready.

An MRT train currently ongoing testing at the Kota Damansara station.

An MRT train currently ongoing testing at the Kota Damansara station.
An MRT train currently ongoing testing at the Kota Damansara station.

The chairs, big fans and platform screen doors already installed inside the Kota Damansara Station.

The chairs, big fans and platform screen doors already installed inside the Kota Damansara Station.
The chairs, big fans and platform screen doors already installed inside the Kota Damansara Station.

MRT stations of MRT Kajang Line

The MRT Kajang Line is the first line of the Klang Valley Mass Rapid Transit Project (KVMRT). The line runs underground for a distance of 9.5km beneath the centre of Kuala Lumpur while the rest of the alignment is elevated. The line has 31 stations of which seven are underground.

MRT Kajang line Alignment Map
MRT Kajang line Alignment Map, view larger version

The following is a simplified table showing the integrations and connections of MRT Kajang line with other rail systems to complete the Greater Kuala Lumpur / Klang Valley Integrated Transit System.

Stations for MRT Kajang Line
SBK01Sungai Buloh ⇄ KA08
SBK02Kampung Selamat
SBK04Kwasa Damansara
SBK05Kwasa Sentral
SBK06Kota Damansara
SBK07Surian
SBK08Mutiara Damansara
SBK09Bandar Utama
SBK10Taman Tun Dr Ismail
SBK12Phileo Damansara
SBK13Pusat Bandar Damansara
SBK14Semantan
SBK15Muzium Negara ⇄ KJ15 MR1 KA01 ERL
SBK16Pasar Seni ⇄ KJ14 KA02
SBK17Merdeka ⇄ AG8 SP8 MR4
SBK18ABukit Bintang ⇄ MR6
SBK20Tun Razak Exchange
SBK21Cochrane
SBK22Maluri ⇄ AG13
SBK23Taman Pertama
SBK24Taman Midah
SBK25Taman Mutiara
SBK26Taman Connaught
SBK27Taman Suntex
SBK28Sri Raya
SBK29Bandar Tun Hussein Onn
SBK30Batu 11 Cheras
SBK31Bukit Dukung
SBK33Sungai Jernih
SBK34Stadium Kajang
SBK34Kajang ⇄ KB06
Site Search

Did you find what you are looking for? Try out the enhanced Google Search:

(Visited 322 times, 2 visits today)

Categorized in: