The following are some of the pictures of Bukit Dukung MRT station during construction.

📅 April 2017

Automated fare collection gates structure that has been installed inside the Bukit Dukung Station.

Automated fare collection gates structure that has been installed inside the Bukit Dukung Station. Apr 2017
Automated fare collection gates structure that has been installed inside the Bukit Dukung Station. Apr 2017

View of the platform at the Bukit Dukung Station.

View of the platform at the Bukit Dukung Station. Apr 2017
View of the platform at the Bukit Dukung Station. Apr 2017

Inside the multi-storey park and ride parking building that has been built next to the Bukit Dukung Station.

Inside the multi-storey park and ride parking building that has been built next to the Bukit Dukung Station. Apr 2017
Inside the multi-storey park and ride parking building that has been built next to the Bukit Dukung Station. Apr 2017

The multi-storey park and ride parking facility that has been built next to the Bukit Dukung Station.

The multi-storey park and ride parking facility that has been built next to the Bukit Dukung Station. Apr 2017
The multi-storey park and ride parking facility that has been built next to the Bukit Dukung Station. Apr 2017

📅 March 2017

Aerial view of the pedestrian link walkway heading to the Bukit Dukung Station being built.

Aerial view of the pedestrian link walkway heading to the Bukit Dukung Station being built. Mar 2017
Aerial view of the pedestrian link walkway heading to the Bukit Dukung Station being built. Mar 2017

📅 February 2017

The automated fare collection gates that have been installed inside Bukit Dukung Station.

The automated fare collection gates that have been installed inside Bukit Dukung Station. Feb 2017
The automated fare collection gates that have been installed inside Bukit Dukung Station. Feb 2017

View of the platform level of the Bukit Dukung MRT Station with the automatic platform doors installed.

View of the platform level of the Bukit Dukung MRT Station with the automatic platform doors installed. Feb 2017
View of the platform level of the Bukit Dukung MRT Station with the automatic platform doors installed. Feb 2017

📅 January 2017

Ongoing construction works of the multi-storey parking facility at the Bukit Dukung Station.

Ongoing construction works of the multi-storey parking facility at the Bukit Dukung Station. Jan 2017
Ongoing construction works of the multi-storey parking facility at the Bukit Dukung Station. Jan 2017

View of the construction of the entrance to the Bukit Dukung Station.

View of the construction of the entrance to the Bukit Dukung Station. Jan 2017
View of the construction of the entrance to the Bukit Dukung Station. Jan 2017

📅 April 2016

View of the multi-storey Park and Ride for the Bukit Dukung Station under construction.

View of the multi-storey Park and Ride for the Bukit Dukung Station under construction. Apr 2016
View of the multi-storey Park and Ride for the Bukit Dukung Station under construction. Apr 2016

📅 January 2016

Construction of the Bukit Dukung Station in progress.

Construction of the Bukit Dukung Station in progress. Jan 2016
Construction of the Bukit Dukung Station in progress. Jan 2016

📅 October 2015

Construction of the Bukit Dukung Station in progress.

Construction of the Bukit Dukung Station in progress. Oct 2015
Construction of the Bukit Dukung Station in progress. Oct 2015

Aerial view of the Bukit Dukung Station. To the left of the station is the multi-storey park and ride facility being constructed.

Aerial view of the Bukit Dukung Station. To the left of the station is the multi-storey park and ride facility being constructed. Oct 2015
Aerial view of the Bukit Dukung Station. To the left of the station is the multi-storey park and ride facility being constructed. Oct 2015

MRT stations of MRT Kajang Line

The MRT Kajang Line is the first line of the Klang Valley Mass Rapid Transit Project (KVMRT). The line runs underground for a distance of 9.5km beneath the centre of Kuala Lumpur while the rest of the alignment is elevated. The line has 31 stations of which seven are underground.

MRT Kajang Line Alignment Map
MRT Kajang Line Alignment Map, view larger version

The following is a simplified table showing the integrations and connections of MRT Kajang Line with other rail systems to complete the Greater Kuala Lumpur / Klang Valley Integrated Transit System.

Stations for MRT Kajang Line
SBK01Sungai Buloh ⇄ KA08
SBK02Kampung Selamat
SBK04Kwasa Damansara
SBK05Kwasa Sentral
SBK06Kota Damansara
SBK07Surian
SBK08Mutiara Damansara
SBK09Bandar Utama
SBK10Taman Tun Dr Ismail
SBK12Phileo Damansara
SBK13Pusat Bandar Damansara
SBK14Semantan
SBK15Muzium Negara ⇄ KJ15 MR1 KA01 ERL
SBK16Pasar Seni ⇄ KJ14 KA02
SBK17Merdeka ⇄ AG8 SP8 MR4
SBK18ABukit Bintang ⇄ MR6
SBK20Tun Razak Exchange
SBK21Cochrane
SBK22Maluri ⇄ AG13
SBK23Taman Pertama
SBK24Taman Midah
SBK25Taman Mutiara
SBK26Taman Connaught
SBK27Taman Suntex
SBK28Sri Raya
SBK29Bandar Tun Hussein Onn
SBK30Batu 11 Cheras
SBK31Bukit Dukung
SBK33Sungai Jernih
SBK34Stadium Kajang
SBK34Kajang ⇄ KB06
Site Search

Did you find what you are looking for? Try out the enhanced Google Search:

(Visited 270 times, 1 visits today)

Categorized in: