The following are some of the pictures of Bukit Bintang MRT station during construction.

📅 July 2017

Entrance E of Bukit Bintang MRT station near the Wolo Hotel.

Entrance E of Bukit Bintang MRT station near the Wolo Hotel (Jul 2017)
Entrance E of Bukit Bintang MRT station near the Wolo Hotel (Jul 2017)

Entrance D of Bukit Bintang station, near Lot 10 shopping mall.

Entrance D of Bukit Bintang station, near Lot 10 shopping mall (Jul 2017)
Entrance D of Bukit Bintang station, near Lot 10 shopping mall (Jul 2017)

Customer service booth at concourse level of Bukit Bintang station.

Customer service booth at concourse level of Bukit Bintang station (Jul 2017)
Customer service booth at concourse level of Bukit Bintang station (Jul 2017)

Dynamic Theme, chosen to represent the dynamic and exciting elements of the country’s top central business district, is reflected with different tones of red on the walls in the interior of the station that suggest movements.

Dynamic Theme, chosen to represent the dynamic and exciting elements of the country's top central business district, is reflected with different tones of red on the walls in the interior of the station that suggest movements. (Jul 2017)
Dynamic Theme, chosen to represent the dynamic and exciting elements of the country’s top central business district, is reflected with different tones of red on the walls in the interior of the station that suggest movements. (Jul 2017)

Concourse level of the Bukit Bintang station.

Concourse level of the Bukit Bintang station (Jul 2017)
Concourse level of the Bukit Bintang station (Jul 2017)

Concourse level of the Bukit Bintang station.

Concourse level of the Bukit Bintang station (Jul 2017)
Concourse level of the Bukit Bintang station (Jul 2017)

Train boarding platform level at Bukit Bintang station.

Train boarding platform level at Bukit Bintang station (Jul 2017)
Train boarding platform level at Bukit Bintang station (Jul 2017)

Escalators to Platform 2 at Bukit Bintang station.

Escalators to Platform 2 at Bukit Bintang station (Jul 2017)
Escalators to Platform 2 at Bukit Bintang station (Jul 2017)

Escalator access between the concourse & platform levels.

Escalator access between the concourse & platform levels (Jul 2017)
Escalator access between the concourse & platform levels (Jul 2017)

📅 April 2017

Final ongoing works to one of the entrances at the Bukit Bintang MRT Station.

Final ongoing works to one of the entrances at the Bukit Bintang MRT Station. (Apr 2017)
Final ongoing works to one of the entrances at the Bukit Bintang MRT Station. (Apr 2017)

Final interior works to the walls of the Bukit Bintang MRT Station that depicts the ‘Dynamic’ theme.

Final interior works to the walls of the Bukit Bintang MRT Station that depicts the 'Dynamic' theme. (Apr 2017)
Final interior works to the walls of the Bukit Bintang MRT Station that depicts the ‘Dynamic’ theme. (Apr 2017)

📅 February 2017

Ongoing works at Entrance D of the Bukit Bintang Station.

Ongoing works at Entrance D of the Bukit Bintang Station. (Feb 2017)
Ongoing works at Entrance D of the Bukit Bintang Station. (Feb 2017)

Platform screen doors that have been installed inside the Bukit Bintang Station.

Platform screen doors that have been installed inside the Bukit Bintang Station. (Feb 2017)
Platform screen doors that have been installed inside the Bukit Bintang Station. (Feb 2017)

📅 January 2017

Work of the entrance of station under construction.

Work of the entrance of station under construction (Jan 2017)
Work of the entrance of station under construction (Jan 2017)

Work of the entrance of station under construction.

Work of the entrance of station under construction (Jan 2017)
Work of the entrance of station under construction (Jan 2017)

Work of the entrance of station under construction.

Sungai
Work of the entrance of station under construction (Jan 2017)

Work of the entrance of station under construction.

Work of the entrance of station under construction (Jan 2017)
Work of the entrance of station under construction (Jan 2017)

Entrance A of the Bukit Bintang Station beside KFC.

Entrance A of the Bukit Bintang Station beside KFC (Jul 2017)
Entrance A of the Bukit Bintang Station beside KFC (Jul 2017)

📅 December 2016

Ongoing works at Entrance D (left) and Entrance E (right) to the Bukit Bintang Station.

Ongoing works at Entrance D (left) and Entrance E (right) to the Bukit Bintang Station. (Dec 2016)
Ongoing works at Entrance D (left) and Entrance E (right) to the Bukit Bintang Station. (Dec 2016)

The escalators that have been installed inside the Bukit Bintang Station.

The escalators that have been installed inside the Bukit Bintang Station. (Dec 2016)
The escalators that have been installed inside the Bukit Bintang Station. (Dec 2016)

📅 October 2016

View of the topside of the Bukit Bintang Station with its entrance and ventilation building under construction.

View of the topside of the Bukit Bintang Station with its entrance and ventilation building under construction. (Oct 2016)
View of the topside of the Bukit Bintang Station with its entrance and ventilation building under construction. (Oct 2016)

Construction of Entrance A of the Bukit Bintang Station beside KFC in progress.

Construction of Entrance A of the Bukit Bintang Station beside KFC in progress. (Oct 2016)
Construction of Entrance A of the Bukit Bintang Station beside KFC in progress. (Oct 2016)

Construction of Entrance F of the Bukit Bintang Station in front of McDonalds in progress.

Construction of Entrance F of the Bukit Bintang Station in front of McDonalds in progress. (Oct 2016)
Construction of Entrance F of the Bukit Bintang Station in front of McDonalds in progress. (Oct 2016)

Work in progress at the platform level of the Bukit Bintang Station.

Work in progress at the platform level of the Bukit Bintang Station. (Oct 2016)
Work in progress at the platform level of the Bukit Bintang Station. (Oct 2016)

📅 Artist impression

Artist impression of Bukit Bintang station.

Artist impression of Bukit Bintang station
Artist impression of Bukit Bintang station
Artist impression of Bukit Bintang station
Artist impression of Bukit Bintang station
Artist impression of Bukit Bintang station
Artist impression of Bukit Bintang station
Artist impression of Bukit Bintang station
Artist impression of Bukit Bintang station
Artist impression of Bukit Bintang station
Artist impression of Bukit Bintang station

MRT stations of MRT Kajang Line

The MRT Kajang Line is the first line of the Klang Valley Mass Rapid Transit Project (KVMRT). The line runs underground for a distance of 9.5km beneath the centre of Kuala Lumpur while the rest of the alignment is elevated. The line has 31 stations of which seven are underground.

MRT Kajang Line Alignment Map
MRT Kajang Line Alignment Map, view larger version

The following is a simplified table showing the integrations and connections of MRT Kajang Line with other rail systems to complete the Greater Kuala Lumpur / Klang Valley Integrated Transit System.

Stations for MRT Kajang Line
SBK01Sungai Buloh ⇄ KA08
SBK02Kampung Selamat
SBK04Kwasa Damansara
SBK05Kwasa Sentral
SBK06Kota Damansara
SBK07Surian
SBK08Mutiara Damansara
SBK09Bandar Utama
SBK10Taman Tun Dr Ismail
SBK12Phileo Damansara
SBK13Pusat Bandar Damansara
SBK14Semantan
SBK15Muzium Negara ⇄ KJ15 MR1 KA01 ERL
SBK16Pasar Seni ⇄ KJ14 KA02
SBK17Merdeka ⇄ AG8 SP8 MR4
SBK18ABukit Bintang ⇄ MR6
SBK20Tun Razak Exchange
SBK21Cochrane
SBK22Maluri ⇄ AG13
SBK23Taman Pertama
SBK24Taman Midah
SBK25Taman Mutiara
SBK26Taman Connaught
SBK27Taman Suntex
SBK28Sri Raya
SBK29Bandar Tun Hussein Onn
SBK30Batu 11 Cheras
SBK31Bukit Dukung
SBK33Sungai Jernih
SBK34Stadium Kajang
SBK34Kajang ⇄ KB06
Site Search

Did you find what you are looking for? Try out the enhanced Google Search:

(Visited 380 times, 1 visits today)

Categorized in: